Documents → #42

2ndWitness Statement of Mr LEUNG Ping Kay (English only)

Document 42 of 243 · 16 pages · 16 images

Witness statement English PDF · scanned ToR2: Fire Service Installations & EquipmentToR4: Supervision, Roles & ResponsibilitiesToR5: Systemic Issues (Collusion, Bid-rigging, Conflicts)ToR3: Building Maintenance & Renovation Works

second statement by Mr. Leung Ping Kay

Summary

The "2nd Witness Statement of Mr. Leung Ping Kay" is a 16-page document submitted to the 1875 Independent Committee investigating the fire at Wang Fuk Court in Tai Po. It supplements Mr. Leung's earlier statement, detailing his professional background, his role as a director at China Status Development and Engineering Company Limited, and the company's scope of work as a Registered Fire Service Installation Contractor. Key responsibilities outlined include preparing tenders, applying for Shut Down Notices (SDNs), and liaising with government departments for fire safety-related projects.

Summary in 繁體中文

本文件為梁炳佳先生第二份英文證人陳述,內容詳述其於王府火災調查中的相關證詞,全文共16頁並附圖片,旨在提供事件關鍵事實。

Key points

  • Mr. Leung Ping Kay supplements his 1st Witness Statement.
  • China Status is a Registered Fire Service Installation Contractor (RFSIC).
  • China Status does not undertake water tank-related works.
  • Mr. Leung is responsible for SDN applications and site inspections.
  • China Status assists other RFSICs with SDN applications.
  • SDN applications require site inspections unless the requester is an RFSIC.

How the Terms of Reference appear in this document

ToR1 fire safety compliance

Details of Mr. Leung's role in applying for Shut Down Notices (SDN) and compliance with the Fire Safety (Buildings) Ordinance (Cap. 572).

ToR2 contractor qualifications and responsibilities

China Status's registration as a Fire Service Installation Contractor (RFSIC) and Mr. Leung's qualifications and responsibilities as a director and authorised signatory.

ToR3 fire service installation practices

China Status's scope of work, including fire service electrical installations and exclusion of water tank works.

Full document (16 pages) — click to expand

Text extraction produced no content (scanned document) — see the extracted images above or the original PDF.

Related documents