Documents → #40
2ndWitness Statement of Mr KU Siu Ping (English only)
Document 40 of 243 · 15 pages · 15 images
Second witness statement of Mr. KU Siu Ping
Summary
Summary in 繁體中文
Key points
- ICU conducted four site inspections on A/C hoods and architectural features.
- Foam boards were used in Wang Fuk Court renovation works.
- Registered Inspector and Contractor are responsible under the Buildings Ordinance.
- Will Power Architects reported lack of fixing reinforcement in A/C hoods.
- Public complaints included cracks on walls and foam board use concerns.
- ICU to provide a Second List of Documents to the Committee.
How the Terms of Reference appear in this document
Details of four site inspections related to A/C hoods and architectural features, including dates (e.g., 25 September 2024, 28 October 2024) and issues such as foam board use and fixing reinforcement.
Mentions of foam boards used in WFC Renovation and their compliance under the Mandatory Building Inspection Scheme (MBIS) and Buildings Ordinance, Cap. 123.
Clarification of the roles of the Registered Inspector (RI) and Registered Contractor (RC) in ensuring compliance with the Buildings Ordinance and professional standards.
In the news
This document connects to these themes in the news coverage analysis (News & Coverage).
Full document (15 pages) — click to expand
Text extraction produced no content (scanned document) — see the extracted images above or the original PDF.
Related documents
- #11 1stWitness Statement of Mr KU Siu Ping (English only)same witness
- #1 1stletter from Mr TSE Kam Ming to the solicitors of the Independent Committee (English only)same Terms of Reference
- #2 1streply from Ms WONG Pik Kiu to the solicitors of the Independent Committee (Chinese only)same Terms of Reference
- #3 1stSupplemental Witness Statement of Mr LEE Kwok Hung (Chinese only)same Terms of Reference
- #4 1stWitness Statement of Mr CHAN Yat Ho, Matthewsame Terms of Reference
- #5 1stWitness Statement of Mr CHENG Ka Chun (English only)same Terms of Reference