部分中文翻譯或有不準確之處,本網站正持續檢視及修正中。如發現錯誤,歡迎電郵
simonwanghkteacher@gmail.com 告知。
所有內容請以官方網站的原始文件為準。
地圖與文件 → #152
Reply from On Cheong Engineering Limited (Chinese only)
文件 152 / 243 · 8 頁 · 8 張圖片 · English version
另一語言的摘要
# 安創工程公司的回覆 **Source**: https://www.ic-wangfukcourtfire.gov.hk/pdf/docs/Reply-On-Cheong.pdf **Local PDF**: pdfs/Reply-On-Cheong.pdf **Pages**: 8 **Images extracted**: 8 **Converted**: 2026-08-16T09:17:10.324452 ## Content...
此為掃描文件,未能抽取可搜尋文字;頁面圖像及下方原始 PDF 載有內容。
另一語言的摘要(English)
The document is an official reply from On Cheong Engineering Limited addressing inquiries related to their involvement in the Wang Fuk Court fire incident. It outlines the company’s position, clarifies their responsibilities, and responds to allegations concerning construction and safety practices. The eight-page response includes detailed explanations and supporting images.
摘要(English)
This document is a formal reply from On Cheong Engineering Limited, addressed to an independent inquiry committee investigating the 2025 Tai Po Hong Fuk Court fire. The committee seeks detailed information regarding On Cheong's subcontracted renovation work at the site, including material procurement, safety compliance, and the use of non-fire-retardant foam boards. The inquiry also addresses allegations of altered fire safety features, such as stairwell windows converted into access points, and requests documentation on decision-making, safety protocols, and related communications.
要點
- On Cheong handled external wall repairs for Wang Fuk Court renovation.
- Foam boards used to protect windows lacked clear fire-retardant specifications.
- Committee seeks details on foam board procurement and fire safety compliance.
- Subcontractor's role in altering fire-rated stairwell windows questioned.
- Smoking by workers on scaffolding raised as a safety concern.
- On Cheong asked to clarify relationships with other subcontractors.
全文(點擊展開)(8 頁)
掃描文件——請參閱原始 PDF。